Safety first. Only inspect locations you can access safely. Do not climb onto roofs, enter flooded areas or approach water-affected electrical equipment. Do not attempt repairs during storm conditions. Record any concerns and arrange an appropriately qualified contractor. YESappears consistent UNSUREmay require further review NOpotential concern identified 0 YES 0 UNSURE 0 NO 47 NOT YET SET 1 Roof and Drainage Check from ground level, windows or other safe vantage points only. Where an area cannot be viewed safely, arrange a qualified roofing contractor. Gutters, box gutters and valleys appear clear of leaves, debris and silt Downpipes and rainwater heads are securely fixed and flowing freely Overflow outlets and spitters are open and unobstructed Drains on accessible podiums and flat areas are clear, with grates in place Visible roof sheets, tiles, flashings and cappings are not loose, lifted or missing Roof hatches and skylights are closed and secured Rooftop plant, solar panels and signage have been confirmed as secure by a qualified contractor Areas where water has previously ponded have been recorded for follow-up 2 Façade and Building Envelope Render, masonry and concrete panels show no new, open or widening cracks There are no visible signs of concrete deterioration, such as rust staining, spalling or exposed reinforcement Window and door frames, seals and sills show no visible gaps or deterioration Windows and external doors are closed and secured Sealant in movement and expansion joints is not split, shrunken or missing Signs of previous water entry, such as staining, white salt deposits (efflorescence) or bubbling paint, have been photographed and recorded 3 Balconies, Podiums and Planter Boxes Balcony and podium drains are clear Tiles are not cracked, lifted or hollow-sounding, and grout is not cracked or missing Soffits and ceilings below balconies show no water staining or deterioration Planter box drains and overflows are clear, with no visible staining or leakage below Door thresholds, hobs and perimeter seals show no visible gaps or damage 4 Basements, Car Parks and Below-Ground Areas Sumps and pits are clear, and pumps have been tested in line with site procedures Pump alarms and backup power systems, where installed, are operational Grated drains at driveway and car park entries are clear of debris Flood barriers or sandbags are available for low-lying entries, where required Existing leaks through walls, slabs and construction joints have been photographed and recorded Records, equipment and stored goods are raised off the floor or moved from vulnerable areas 5 Grounds and Surrounding Areas Surface water drains away from the building rather than towards it Stormwater pits, channels and grates are clear Branch hazards near roofs and gutters have been noted for qualified assessment Branches near power lines have been reported to the electricity distributor Outdoor furniture, bins, signage and loose equipment are secured or stored 6 Electrical and Life Safety There are no visible signs of water entry near switchboards, electrical rooms or plant rooms The lift service provider has been contacted if water entry into the lift pit is suspected Emergency and exit lighting inspections are current Access is restricted around any water-affected electrical equipment, and a licensed electrician has been contacted Staff and contractors understand that roofs and elevated areas must not be accessed during storm conditions 7 Active Works, Vacant Areas and Communication Scaffolding, temporary waterproofing and open penetrations on any active works have been checked by the contractor Vacant units, tenancies and rarely used areas have been checked or allocated to a responsible person Residents, tenants and staff know how to report leaks, damage or safety concerns After-hours emergency contacts are current and easy to find Keys and access to roof hatches, plant rooms and basements are available to authorised responders Dated photographs of the building’s current condition have been taken for maintenance and insurance records 8 After the Storm Conditions have been confirmed as safe before any inspection begins Safe, accessible areas have been checked for water entry, cracking or damage Roofs and elevated areas have been inspected by appropriately qualified personnel Water entry, cracking and visible damage have been photographed and dated The time and location where water first appeared have been recorded, as the entry point may sit elsewhere A specialist inspection has been arranged for recurring leaks, significant deterioration or new structural cracking Your Details